Blessed Sacrament Gym
Milwaukee, Wisconsin
Project Type:
Project Overview
Construction was completed in August of 2001 for this 11,700 sf multi-purpose gym and auditorium addition to a 300 student private grade school. The programmed space is linked into a 1940’s cafeteria to create a versatile space for sporting events, gatherings, plays, lectures and social events. The new addition is completely accessible while being below grade 8’0″, which allowed the school classrooms to maintain outside windows. The addition includes a new 4 stop elevator, locker and shower rooms, toilets, storage space, small stage & bleachers. The project also included renovations to several science labs.

View Project Gallery