Rialto Theatre

Mr. Pfaller undertook the master plan schemes, architectural feasibility studies, impact statements, marketing analysis and design of this extensive rehabilitation and restoration project comprised of over three million cubic feet. This project adapted a large movie palace, repertory theater, and commercial space into a regional performing arts center. The project also involved the reseating and…

Read More

Pabst Theatre

As part of the Milwaukee Center Theater District, a 3,000 sf area was set aside by the Trammell Crow Company and the City of Milwaukee to house additional lobby space, toilet facilities and a new box-office for the Pabst Theater. Pfaller’s firm was selected to complete the architecture for the new lobby space and is…

Read More

Fox Meyer Theatre

Spring of 2002 was the opening date at the Fox Meyer Theater. This theater underwent a major restoration effort and an addition to this 1920’s atmospheric movie theater has been applied. Mr. Pfaller was hired by the City of Green Bay to provide comprehensive architectural services for the conversion of this 1400 seat movie house…

Read More

Grand Opera House

In the restoration of this 850-seat opera house built in 1883, Mr. Pfaller acted as Partner-in-Charge and head design architect for the architectural and engineering team which included two architectural firms and a full complement of consultants. The team was responsible for programming, masterplanning, schematic design, design development and coordination of consultant design input. This…

Read More

Centennial Hall Restoration

As well as serving as Partner-in-Charge of this restoration project, Mr. Pfaller was also the lead design architect and field representative. The hall and two lecture rooms were returned to their 1913 elegance and all electrical and HVAC systems were retrofit to the original structure. This project included entrance design work compatible with the architecture…

Read More

Great Lakes Naval Base

Mr. Pfaller acted as a consultant to the Navy to observe and assure construction contract conformance on the restoration of two National Register Buildings located on the Great Lakes Naval Base. Building No. 4, originally built as a drill hall, went through an extensive $2 million exterior restoration. The project involved rebuilding parapet walls, repairing…

Read More

Marian Center Facade Restoration

The Marian Center was in the third year of a five year capital improvements restoration project when a severely deteriorated structural column was discovered behind the face brick. The structural integrity of the column had been compromised to the point where the column had to be replaced. Mr. Pfaller (lead design architect), the contractor, and…

Read More

Heritage School Restoration

The Old Third Ward School, a two-room schoolhouse built in 1976, is owned by the Sheboygan Area School District and was restored to house an interpretive museum. This project involved delicate removal of 20th Century remodeling, as well as duplication of period ornamentation to replace damaged or missing historic elements. All contemporary systems such as…

Read More